1. Complete the production of the engineering prototype and achieve a pressure output of 21 Mpa.
2. Complete the construction of the experimental bench.
3. After the success of this project, it can be transformed into a horizontal project, and with the help of external resources, complete the development of products with 30 Mpa and above.